Main content

Locals "delighted" Ulverston line re-opens

Flood damage to the Barrow to Lancaster line has been repaired ahead of time. It was expected to take until Friday to remove 240 tons of soil and rocks washed into the cutting. Here's how passengers coped this weekend after this local lifeline was severed. Picture - Network Rail

Release date:

Duration:

6 minutes

This clip is from